Click on the news for more details.
It only took 20 days from confirming the project details to placing an order.
Two sets of stringing equipment will be sent to Middle of Africa
The real shot of the equipment test
Boyu engineer's real pictures of machine training tests in various parts of the China this year.
The Indonesian customer ordered the machine from our Indonesian warehouse in September, and our engineer also gave the customer's staff operation training.
Customers who purchased the stringing equipment in March this year sent us feedback videos of good machine operation.
The winning order in cooperation with customers has been completed on time within 30 days.
The second order’s products from South African customer shipped on time.
Actively responding to the new technology requirements of China's State Grid, updated transmission line stringing equipment have been shipped in China one after another.
Our engineer is providing on-site training services to customers in the Philippines .
A full container is about to be shipped.
A 20GP container full of goods will be shipped to South Africa.
Equipment and Accessories ordered by a customer from Africa, about to be shipped on board
The first centralized control intelligent visual substation centralized control station that Boyu participated in the construction was successfully put into use.
One machine has been shipped to Kazakhstan
China's stringing equipment needs to upgrade the control system to visual centralized control.
Two new equipments and tools such as pulleys to be sent to Bangladesh.
200 pulleys, pasting marks.
Domestic delivery real shot
We believe that no matter the size of the project,it deserves the very best.
3
222